Mikrofill at Basingstoke fire station

The existing Basingstoke Fire Station building dating back to 1966 has made way for the construction of a new £6m ultra-modern facility. The new station will accommodate improved modern living quarters, a training tower and smoke training building. To maintain continuity of service during construction the existing training facilities were converted into the fire-fighters temporary home.

Part of the new services package carried out by long established mechanical contractor J & B Hopkins Ltd was the installation of an indirect Wras approved Extreme 300 litre HWS ‘loading cylinder’. The Extreme is designed to maximise condensing boiler efficiency by operating at a ∆t of 30°C (80/50°C) via its integral stainless steel plate heat exchanger. Capable of producing in excess of 2300 l/hr at 60°C the unvented cylinder comfortably accommodates the stations peak hot water demand in the changing rooms and kitchen area.

The Extreme was supplied c/w an unvented kit and a factory fitted single phase 3kW immersion heater.

For more information on these and other Mikrofill products please contact the sales team on 03452 606020 or visit www.mikrofill.com

 

 

 

 

 

You might also like