A fast response by Humidity Solutions, with provision of two mobile humidifiers, enabled Process Systems Enterprise (PSE) to quickly restore comfortable, healthy conditions following a power failure.

PSE is a leading supplier of advanced process modelling software and model-based engineering and innovation services to process industries. The company’s headquarters are in west London, where a power failure recently disabled the climatic control in the building.

The result was a reduction in humidity levels, leading to complaints of dry eyes, cracked lips and static shock from machines. PSE therefore contacted Humidity Solutions, which supplied two mobile humidifiers the next day.

PSE Finance Director Brian McKenzie recalled: “Some of our staff were complaining of becoming less productive following the temporary failure of the climatic controls, so we were delighted that Humidity Solutions was able to react so quickly and efficiently.”

 

Further information: www.humiditysolutions.co.uk