Vaillant’s ecoCRAFT 120, part of its high efficiency floor standing commercial boiler range, has been commended with top marks by the head teacher and staff at Millbank Primary School, Westminster.  Two high efficiency, condensing floor standing ecoCRAFT commercial boilers have been specified and installed by Enterprise FM at the school.

Millbank Primary School needed to replace one of its original boilers as this failed before the autumn half term.  Although there were concerns about the second boiler failing shortly too, there was only enough time and budget to install one replacement.  Vaillant’s energy efficient floor standing boiler, the ecoCRAFT 120 was specified and installed that week.  The improvements to the heating and hot water in the school were so immediate that the school decided to fund a second replacement ecoCRAFT 120 boiler out of its own resources.

Robin Stokes of Enterprise FM commented: “Enterprise FM uses Vaillant boilers on our domestic projects and so it was really a natural progression to begin to specify Vaillant’s commercial boilers.  Vaillant is one of our preferred suppliers because of the high level of product reliability and excellent after sales service and support.”

Trevor Standley, the school’s keeper said: “The new boilers are much more efficient than the old ones.  Before, the old boilers would break down and the first I’d know about it was that one of the teachers would tell me that there was no hot water or that the heating had gone off.  That simply doesn’t happen now.  The Vaillant boilers operate quietly and are a lot more economical to run.   Replacing both boilers has made the supply of hot water and heating around the school a lot more straightforward and efficient.”

The ecoCRAFT delivers efficiencies that are some of the highest in its class, with a fully modulating, down firing heat engine which ensures that power is delivered at no compromise to running costs. Each model offers a diagnostic numeric display that enables simple and efficient commissioning, servicing, and operation. The ecoCRAFT can also be installed in cascade to meet greater output demands.