BSEE - Building Services and Environmental Engineer
RSS
  • Click here to visit the ABB website
The emergency winter choice
Published:  09 January, 2012

Are your heat exchangers not working efficiently in the winter weather? Breakdowns and a long wait time for delivery? With their ‘off the shelf’ availability, Clixcoolers the new, unique, modular forced air heat exchangers from Forward Industrial Products can be delivered and installed in just 72 hours.

With their patented design encompassing special aluminium multiport tubes and fins currently used in aerospace heat transfer, Clixcoolers are more efficient and cost effective than traditional copper tube aluminium finned coil type heat exchangers. And because they are UK designed and manufactured, they can be supplied quickly in an emergency, so minimising hourly and daily losses incurred during plant shut down.

Individual sections of the system can be replaced rather than complete units, reducing cost, wastage and maintenance down-time for repairs.  Speed of installation in most locations can also be guaranteed thanks to the modular system which is delivered in virtually flat pack format.  The modular construction means less need for heavy lifting gear during initial assembly as well as on-going servicing and repairs.

www.forwardindustrial.co.uk







© Copyright 2012 Building Services & Environmental Engineer. Datateam Business Media Limited. All rights reserved.
Registered in England No: 1771113. VAT No: 834 8567 90.
Registered Office: 8-10 Dryden Street, Covent Garden, London WC2E 9NA
Webmaster