BSEE - Building Services and Environmental Engineer
RSS
  • Click here to visit the ABB website
New from Potterton Commercial
Published:  26 August, 2009

Commercial boiler specialist Potterton Commercial presents the Paramount MB, a modular prefabricated condensing heating solution to significantly reduce downtime for existing buildings and reduce installation time.

Paramount MB is suitable for new and existing plant rooms within a variety of applications, including education, hospital and sport and leisure establishments. Innovative, pre-prepared and supplied in individual modules, Paramount MB includes high efficiency condensing boilers, pumps, a pressurisation system and heating controls.

Paramount MB is ready for plug and play installations and, consequently, the time between order and delivery is reduced by up to 40%. As the system is constructed off site, it allows strip out, installation and commissioning of a replacement system within an existing boiler house in 3-5 days as against the previous on-site building process that took 3-5 weeks.

The Paramount MB is driven by Potterton Commercial's Paramount two boilers and is available in outputs ranging from 60kW to 690kW. All Paramount two wall-hung boilers feature a superior heat exchanger design and offer optimum heat transfer and exceptional energy efficiency of 109%, as well as low noise level operation.

www.pottertoncommercial.com.uk







© Copyright 2012 Building Services & Environmental Engineer. Datateam Business Media Limited. All rights reserved.
Registered in England No: 1771113. VAT No: 834 8567 90.
Registered Office: 8-10 Dryden Street, Covent Garden, London WC2E 9NA
Webmaster