|
The largest entertainment venue in Europe is really rocking, thanks to the involvement of Zucchini in this major project to re-design its electrical power systems.
Zucchini supplied 15 of their latest generation EdM cast resin transformers from their 1250 to 3150 KVA power ranges for the high-profile O2 Arena which now offers a world of entertainment under one roof. Reduced noise, zero maintenance, energy efficiency, non-polluting and fire-resistance all played important roles in the selection of Zucchini EdM Transformers to maximise the power input to the lighting, electrical and electronic systems. Zucchini worked in close co-operation with Sapphire Controls of Norwich who were responsible for the transformer installation project.
Working in close co-operation with DES Electrical of Blackpool and T. Clarke PLC of London, Zucchini also supplied and installed their 2,500A, SC high power, busbar systems with weatherproof specifications. These systems were specially selected to distribute power throughout the new 2,350 capacity indigO2 live music venue, which is housed inside The O2 Arena. The product benefits offered by the Company's SC systems - particularly in terms of design, flexibility, performance and versatility were all plus points in favour of Zucchini, as installations needed to be future proof.
- Not all condensing boilers condense all of the...
- Air source heat pumps - how do they compare to...
- How underfloor heating drives down whole-life...
- Shedding light on office lighting design
- WHOLE-HOUSE VENTILATION SYSTEM RESPONDS TO MOD...
- How limited are your downlighter covers?
- Avoiding corrosion
- A Glossary of construction terms
- Solar powered air conditioning: the facts
- Why chilled beams have hit the roof
Building services engineering companies will be better-placed to weather the recession if they are open-minded to improving their efficiency by receiving expert advice and support with business matters.





