BSEE - Building Services and Environmental Engineer
RSS
  • Click here to visit the ABB website
Simmtronic controls M&S
Published:  02 June, 2005

Simmtronic has supplied the complete lighting control system installed in Marks & Spencer’s new HQ at 1 & 2 Waterside, Paddington Basin, having initially successfully fulfilled the lighting controls contract on the building shell and core. When Marks & Spencer took the building, electrical contractor Hills Electrical called on Simmtronic again to provide the lighting controls for the full Cat B fitout, tailored to meet the precise requirement of the new tenant.

On this dramatic 10-storey office development,the consultants elected to have mains borne signalling as it simplified installation into what is a conventionally wired building. The SPECS3 system supplied by Simmtronic combines energy-efficient,variable daylight linking and occupancy control, driven by over 1300 lighting control modules.

Throughout the main open plan areas presence based control is employed with energy-saving photocell dimming control on perimeter lights responding to daylight penetration. Meeting rooms have been provided with scene setting functions and Simmtronic has employed presence detection linked to a specially produced display panel, representing the floor layout, to provide a constant indicator of each meeting room’s occupancy/availability.

The lighting control system has also been utilised to monitor disabled toilet alarms.







© Copyright 2012 Building Services & Environmental Engineer. Datateam Business Media Limited. All rights reserved.
Registered in England No: 1771113. VAT No: 834 8567 90.
Registered Office: 8-10 Dryden Street, Covent Garden, London WC2E 9NA
Webmaster