Armstrong speeds the way

Armstrong 8000 Series packaged pump solutions have helped to keep extremely tight project timescales on track for London Underground’s refurbishment of Neasden Depot.

Neasden Depot is the largest depot in the London Underground network and the main maintenance depot for the Metropolitan Line. The major refurbishment project currently underway at the depot will create facilities suitable to accommodate a new fleet of air conditioned Tube trains.

The scale of the project, and the need to keep disruption to a minimum for passengers, meant that timescales were extremely tight. Main contractor BAM Nuttall and M & E contractor M J Quinn Integrated Services Ltd decided that off-site manufacture would have major benefits for this high profile project.

Armstrong 8000 Series pump solutions are complete fluid management systems, which are pre-designed and manufactured off-site, with the capability to be configured to suit the specific application. They offer specifiers lowest first installed cost, reduced footprint and the opportunity for outstanding energy efficiency performance. While work continued on site at Neasden Depot, Armstrong preassembled and tested the pump packages at its purposedesigned factory in Halesowen, West Midlands.

www.armstrongintegrated.com

0